Petroup on Social Media


PetroUp (new techniques of drilling)

As a future petroleum engineer, you must seek the newest technology in petroleum industry in general and specially in the well drilling field. But unfortunately, you face a great problem that, your faculty provides only the basic courses of petroleum industry field and ignores the advanced ones.

Date : 13/3/2016

Location : Shamsia Space

Attendants : 50




4D Seismic Surveying

Seismic surveying can be limited to two dimensions:length and width, three dimensions:length,width and height and four dimensions:length,width ,height and time. The last one is called: 4D seismic surveying or time-lapse surveying.




Napesco fishing seminar

As a petroleum engineer, you must have basic knowledge about fishing which is operation of extracting some object (called a fish ) that hinders drilling process.